
The school was housed in an old Victorian building which desperately needed a new lease of life. In a partnership with the architects, GSE (main contractors) and Eco Frame Systems the school underwent a huge revamp to include refurbishment of the existing building, extension to the exisiting building and a new build. Eco Frames were contracted to build the two storey timber frame for the stunning new build. The two storey extension connects the existing Victorian building with a previous extension to create a secure external reading courtyard with a sunken amphitheatre section shaded by a sweeping canopy.
For more information on Castle Hill Primary School see
http://www.castlehill.kent.sch.uk/Gallery/Gallery2/GALLERY02.htm